We're Hiring
- Asst. Manager / Deputy Manager (Pithampur, Indore-M.P., India)
- Asst. Manager / Deputy Manager / Manager HR (Oragadam, Chennai)
- Technical Assistant / GET / Service Engineer (PAN India)
- GET / Sales Executive (PAN India)
Please send your resume to [email protected] or visit our Careers Page for more information.
Static Loading Systems
Cement Loading Systems
This system is used to load the cement in closed wagons. We can load single-wagon or two wagons simultaneously. This system controls the dust emission and the loading is completely very faster.
Fly Ash Loading Systems
This system weighs incoming trucks and load clinker into those trucks through dustless loading spouts and after the completion of weighment the data is transfer to PC.
Control Desk
Used for loading of Cement, fly ash (or) coal in Wagons, a control desk consist of centralized loading station for loading 8 number of wagons at the same time. Rice Lake uses 920i controller (or) any PLC with latest Input, output, analog modules ( based customer suggestion ) It consist of central control desk , MCC panel, Local Control Station and weight indicators .
Single computer is used with moxa card to communicate with all 8 number of 420 weight indicators, thereby enabling operator to control and use all 8 no of wagons, loading material simultaneously
.
Clinker Loading Systems
This system is used to load clinker in a single wagon or two wagons simultaneously through a static wagon weighbridge. The loading is done through a Dustless loading spout . The time taken for loading one rack is 2 hr.30 minutes. After the completion of weighment the data is transferred to PC (both Gross weight and Net weight).